Spain 35 Future (Continuous futures contract)Spain 35 Future (Continuous futures contract)Spain 35 Future (Continuous futures contract)

Spain 35 Future (Continuous futures contract)

Nessun attività
Visualizza sui grafici

Forum Spain 35 Future (Continuous futures contract)

Tracy-8 (T-8) = 30/45/60 minuti
Tracy-7 (T-7) = 1/1,5/2 hh
Tracy-6 (T-6) = 2,25/3/4 hh 3/4/5,5 barre 45m
Tracy-5 (T-5) = 4,5/6/8,25 hh 6/8/11 Barre 45m
Tracy-4 (T-4) = 9/12/16,5 hh 12/16/21 Barre 45m
Tracy-3 (T-3) = 18/24/33 hh 24/32/44 Barre 45m
Tracy-2 (T-2) = 1,5/2/2,75/3,5 gg 48/64/88 Barre 45m
Tracy-1 (T-1) = 3/4/5,5 gg 96/128/176
Tracy ( T ) = 6/8/11 gg 192/256/352 ( media 8gg )Settimanale
Tracy+1 (T+1) = 12/16/21 gg ( media 15-16gg ) Bisettimanale
Tracy+2 (T+2) = 24/32/43 gg ( media 28-32gg ) mensile
Tracy+3 (T+3) = 48/64/84 gg ( media 69-72gg ) trimestrale
Tracy+4 (T+4) = 96/128/168 gg ( media 6 mm ) semestrale
Tracy+5 (T+5) = 192/256/336 gg ( media 12 mm ) annuale
Tracy+6 (T+6) = 384/512/672 gg (2 anni) Biennale
Tracy+7 (T+7) = 768/1024/1344 gg (4 anni)
Tracy+8 (T+8) = 1536/2048/2688 gg (8 anni)
Tracy+9 (T+9)= 3072/4096/5376 gg (16 anni)